ALWAYS ONE STEP AHEAD
AN INNOVATIVE REVOLUTIONARY PROCESS
FOR ROAD CONSTRUCTION
In combination with UNDERBOLD-POD30, the properties of the known hydraulic binders are positively improved and an unbeatable overall system is created to eliminate many problems and restrictions in road construction from an economic, technical and ecological point of view.
ADVANTAGES OF ORIGINAL UNDERBOLD-POD30
TIME
Significant time savings due to shorter construction time for the overall project
COSTS
Significant cost savings due to the faster and more efficient construction method. Reduced use of materials & machinery
DURABILITY
Increase in load-bearing capacity
+ Increase in the modulus of rigidity + Increase in elasticity + Complete frost resistance
ENVIRONMENT
100% natural components. Fewer exhaust emissions due to less material movement. Reduction of CO2.
Economic advantages
+ Significant time savings due to shorter construction time of
the overall project overall project
+ Reduction of the layers of the bound superstructure
depending on the traffic load.
+ Reduction of the cement requirement taking into account the
load-bearing capacity requirements
+ Extended durability
+ Lower maintenance costs
+ Reduction or avoidance of soil movements
+ Elimination of landfill and disposal fees
+ Reduced impact on flowing traffic
Advantages of material and processing
+ Increase in load-bearing capacity
+ Increase in the modulus of rigidity
+ Increase in elasticity
+ Reduction of the setting time outside the
processing period
+ Reduction of the shrinkage tendency and thus practically free
from cracking
+ Generally no notching or relaxation required
+ Hydrophobic setting and reduction of water penetration
water penetration depth
+ Reduction of micropores and capillary action
+ Complete frost resistance
+ Adaptable application depending on soil
soil conditions and water content.
+ Complete avoidance of pollutant discharge from treated soils
treated soils and contaminated superstructure layers