APPLICATION OF UNDERBOLD-POD30
Higher compressive strength than with a conventional road construction method!
Compared to conventional stabilisation, the use of UNDERBOLD-POD30 does not require any special or additional equipment or systems.
The optimum mixing ratio of the additive with the cement and the mineral mixture (soil or rock) is determined using the soil parameters to be tested and adapted to the client's specifications.
Sampling and control tests to verify the optimum quality success are orientated towards the application and the client's specifications.
UNDERBOLD-POD30 has convincingly demonstrated its properties in use in many countries.
Brief description of the UNDERBOLD-POD30 workflow
(Details can be found in our brochure "Processing recommendations", which you can request from us)
PREPARATION
Levelling of the surface, removal of the organic top layer, preliminary profiling.
MIXING IN
Mixing in the emulsion. Crushing and mixing of the soil with the Underbold POD30 water mixture.
Preliminary profiling.
DISTRIBUTION OF BINDERS
Distribution of the binder on the surface.
INPUT
Mixing the soil with the binder
PROFILING
Final profiling of the desired gradient
COMPRESSION
Maximum compaction of the mixture